Short answer: specify the scraper filter as a controlled process package, not only as a stainless-steel vessel. The RFQ should define cleaning triggers, differential-pressure instruments, timer ranges, external signals, drain-valve sequence, motor power supply, alarms, local/remote modes and the safe state after power or signal loss.
Request a Self-Cleaning Filter Proposal
The INCE self-cleaning product sheet lists PLC/HMI control with cleaning triggered by time, differential pressure or external process signals. It also lists a motorized scraper, automatic drain, reusable 304/316L V-slot screen and a DN40 flanged drain. Final logic must be agreed for the actual liquid and plant control system.

Which cleaning trigger should the RFQ include?
| Trigger | Use in the control narrative | Buyer should define |
|---|---|---|
| Elapsed time | Runs a cleaning cycle at an adjustable interval | Initial interval, adjustable range and override conditions |
| Differential pressure | Starts cleaning when measured ΔP reaches the agreed setpoint | Transmitter range, units, alarm and high-high response |
| External signal | Accepts a plant PLC or process permission/start signal | Signal type, voltage, dry contact or communications requirement |
| Manual command | Allows a supervised local test or maintenance cycle | Key/selector access, hold-to-run logic and interlocks |
A robust RFQ normally requests at least one primary trigger plus a backup timed cycle, but the final sequence should match the contamination rate and plant philosophy. Review the verified product range at the self-cleaning filter housing page.
What verified mechanical data must be linked to the controls?
- Reference housing sizes: 219, 273, 325, 377, 400, 450, 550 and 800 mm.
- Reference flow: at least 1 T/H, with final design based on the required process flow.
- Filtration rating: up to 20 µm; confirm the actual V-slot opening and retention requirement.
- Filter area: at least 0.12 m², customizable.
- Housing/screen: 304 or 316L stainless steel V-slot element.
- Reference scraper/seal: PTFE scraper and Viton/FKM seal.
- Operating pressure: 0.8 MPa reference, subject to final design confirmation.
- Reference drive power: 0.37–0.55 kW; final motor depends on torque and unit size.

Control-panel and integration checklist
| System item | RFQ requirement |
|---|---|
| Power | Voltage, phase, frequency, motor starter/VFD requirement and control voltage |
| HMI | Language, user levels, setpoint access, cycle counter and alarm history |
| Signals | Run, ready, cleaning, fault, high ΔP, drain open/closed and remote enable |
| Communications | Required protocol, network medium and register/point list |
| Drain sequence | Valve type, open time, confirmation switch, receiving system and discharge restrictions |
| Interlocks | No-flow, valve position, motor overload, high pressure, maintenance mode and emergency stop |
| Environment | Indoor/outdoor, enclosure rating, ambient temperature and hazardous-area requirement |
| Documentation | GA drawing, P&ID, I/O list, wiring diagram, control narrative, manuals and test records |
Send Your P&ID and Control Requirements
What process data is still required?
Send the liquid composition, viscosity at operating temperature, solids concentration, particle shape, required flow, operating/design pressure, temperature, target slot size, allowable ΔP, inlet/outlet standard, installation orientation and discharge destination. The controller cannot compensate for a screen that is undersized for viscous liquid or a drain line that cannot accept the discharged solids.

Factory acceptance and commissioning questions
- Will the supplier demonstrate timed, ΔP and remote-start cycles?
- Are simulated instrument failures and motor overload alarms included in FAT?
- Is the drain valve supplied, and is position feedback included?
- Which parameters are adjustable without engineering access?
- Who supplies field instruments, cabling and plant PLC integration?
- What spare scraper, seal and screen items should be quoted?
Frequently asked questions
Can cleaning run without stopping filtration?
The product is designed for on-line automatic cleaning, but the allowable flow and pressure disturbance must be confirmed for the engineered package.
Should cleaning be time-based or differential-pressure-based?
Use the process behavior to choose. Many buyers request ΔP control with a backup timer and external command, subject to the agreed control narrative.
What should be included for an accurate quotation?
Provide process data, screen target, mechanical connections, power, I/O, communications, interlocks, drain sequence, drawings, documents and quantity.